FAQ

  • Q What is the average lead time?

    A For batch production, the lead time is about 15-60 days after receiving the deposit payment. We can provide production schedule and related photos every two weeks. The lead times become effective when (1) we have received your deposit, and (2) we have your final approval for production drawings. If our lead times do not work with your deadline, please send your requirements with your sale. In all cases we will try our best to accommodate our production plan to your needs.
  • Q How to get a quotation?

    A Please send us drawings along with detailed requirements.
  • Q Do you have spot goods in stock?

    A As one professional OEM/ODM manufacturer specializing in the design, development and manufacture in the foundry industry, we only customize products based on customer's order/drawings/requirements, that means there won't be any extra spot goods available in stock. We don't think your required specification will be exactly the same as others.
  • Q What's your main business?

    A
    Our main business is custom metal parts processed by CNC machining, casting, forging etc., serving industries including railway, automobile, construction machinery, gym equipment, water gas and oil.
  • Q What's the execution standard?

    A ISO/ANSI/DIN/JIS/ EN/GOST/AS standard.
  • Q What's your product range?

    A Our foundry customize all kinds of castings with CNC machining according to customer’s drawings. For valve parts, We produce Butterfly valve, Gate valve, Check valve, Y strainer ,Water Controlling Valve and other Pipe Accessories.
  • Q Are you a trading company or a manufacturer?

    A We are a factory integrating research, development, production and sales.

Quick Links

Products Category

Contact Us

+86-633-2227007
17F, Tower A, International Edifice, No. 179, Tai’An Road, Rizhao City, Shandong Province, P. R. China

Subscribe To Our Newsletter

Copyright ©  2026 Sino Industry and Trade Co., Ltd. All Rights Reserved.  | Sitemap |  Privacy Policy